Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Sep 24, 2022     45-15 Cabin Door and Transparencies step 3 - (6 hours)       Category: Fuselage
Drilled holes in the C-1010 Pin Blocks. Used scrap tube to hold pin blocks in place. drilled #12 holes for the screws on all pin blocks. Holes drilled parallel to plane axis and not to the skin.
Marked all pin blocks deburred and adapted the holes. attached the blocks to fuselage and checked operation of latch mechanism. little adaptation required for smoother operation. final adaptation after the McMaster seal will be installed


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.